After a challenging 2020 for all industries, we’ve fitted out several projects, most notable Stanley Gibbons, The Strand. A 5 months major refurbishment was required and successfully fitted out. We’ve also fitted out Peloton’s pop up offices in London, whilst fitting out 2 Surge Fitness Studios at Bank & Fleet Street, London. All of the furniture at Surge was manufactured & installed by Prodrive Shopfitting with both projects running concurrently. We’re currently embarking on a 14 weeks project for Canali on New Bond Street, due to finish October 2020.
